Market
Market image

Prospects

Wheeling System

The budget speech of the FY 2021/22 contains reference about introduction of wheeling system in Nepal’s power sector.

Power Trading, Open Access

The proposed  Electricity Act -2077 has made provision of power sales by private sector . It also ensures open access to NEA’s transmission line grid system for power trading.

Legal and regulatory framework for Cross Border Electricity Trade (CBET)

India’s Guidelines, regulations and rules on import /export of power, CBET are viewed as a breakthrough, as it has enabling provisions for access to India’s power exchange, and support for trilateral trade transactions.

Regional Energy Trade

Regional Forum like SAARC, BIMSTEC, SASEC Agreements, provides  framework for regional co-operation in power connectivity in South Asia Region. India is already importing  364 MW of  power from Nepal.

Regional Electricity Market

South Asia Forum for Electricity Market (SAFEM),  Market-based Electricity Trade in South Asian Region

The prospects for power trade by private sector never brighter before in Nepal.

Benefits

Easy access to the competitive  electricity market means more investors will be motivated to construct and commission energy projects, resulting in following benefits:

To the consumers

Reliable, affordable electricity supply 24 x 7

To the Independent Power Producers

Competitive electricity market inside Nepal or cross border.  Design based on optimization study, and  Surplus energy, on top of the committed energy to NEA, domestic or cross border electricity market, fetching competitive price Switch-over to Peaking Run of River from the Run of River Projects, to sell energy during peak hours, when the tariff rate is the maximum. Project viability of hydropower projects can be improved . Also, IPPs might prefer peaking run of reservoir and reservoir projects. Option to sell energy to NEA or PTEEL, by entering into PPA with either NEA or PTEEL

To the public in general

More energy project means Local rural economy in the periphery of project area, enhanced due to increased economic activities ( constructions and CSR Activities) More energy project means Local population of the project area to benefit from the provision of separate shares for project affected people. People of Nepal , outside the Project area , also to benefit from the provision of shares.

To the Government

Optimum design means optimum utilization of hydropower potential at a river stretch Guaranteed sale of power means more projects will come up, contributing to local and regional economic development,  Increased revenue, in infrastructures and social sectors like transmission lines , health, education, poverty alleviation etc.